SMI 9-2320-387-14&P-1
Change 4
12-159
FOLLOW-ON TASKS: • Connect battery ground cable (para. 4-68).
• Check for proper operation of troop/cargo heater (TM 9-2320-387-10).
TASKS
12-105. TROOP/CARGO WINTERIZATION HEATER CONTROL BOX AND ANGLE
BRACKET REPLACEMENT (Cont’d)