25-7.1. CARGO SHELL MAINTENANCE (M1151) (
Cont’d
)
7.
Remove two nuts (5), washers (4), screws (1), and footman loop (2) from wheelhouse (3).
8.
Remove two locknuts (16), studs (15), washers (14), snubber plates (13), mounts (12), and
bushings (11) from support tubes (10) to roof (9). Discard locknuts (16).
9.
Remove four screws (6), washers (18), and roof (9) from B-pillar covers (17).
10.
Remove two locknuts (25), washers (26), capscrews (27), washers (26), and support tube (21) from
right B-pillar (22). Discard locknuts (25).
11.
Remove two locknuts (24), capscrews (19), striker plate (20), and strap bracket (23) from
right B-pillar (22). Discard locknuts (24).
SMI 9-2320-387-14&P-1
25-20.4
Change 4
1
2
3
4
5