SMI-9-2320-387-14P-1

TRUCK, UTILITY: EXPANDED CAPACITY

SUPPLEMENTAL OPERATION, MAINTENANCE, AND REPAIR PARTS INSTRUCTIONS

JULY 2004

  SMI-9-2320-387-14P-1 - Page 414 of 671

25-7.1. CARGO SHELL MAINTENANCE (M1151) (
Cont’d
)
10.
Install support tube (1) to C-pillar (22) with two washers (3), capscrews (2), washers (3), and
locknuts (4).
11.
Install cargo shell support tube (1) to wheelhouse (11) with two washers (17), capscrews (21),
washers (17), and locknuts (16).
12.
Install seal (10) and cargo shell (7) to wheelhouse (11) with nine washers (6), capscrews (5),
spacers (18), washers (6), and locknuts (15). Tighten locknuts (15) to 85-110 lb-in. (10-12 N
.
m).
13.
Install support tube (45) to right B-pillar (46) with two washers (50), capscrews (51), washers (50),
and locknuts (49).
14.
Install striker plate (44) and strap bracket (47) to right B-pillar (46) with two
capscrews (43) and locknuts (48). Tighten locknuts (48) and (49) to 21 lb-ft (29 N
.
m).
15.
Install roof (23) to B-pillar cover (30) with four washers (31) and screws (32). Tighten screws (32) to
15 lb-ft (20 N
.
m).
16.
Install rear ring support (36) to C-pillar support bracket (37) with plate (35), bushing (38),
mount (39), snubber (40), washer (41), and capscrew (42). Tighten capscrew (42) to 37 lb-ft
(50 N
.
m).
17.
Install roof (23) to cargo shell support tube (1) with two bushings (24), mounts (25), snubbers (26),
washers (27), studs (28), and locknuts (29). Tighten locknuts (29) to 37 lb-ft (50 N
.
m).
18.
Install striker mounting plate (12) on cargo shell (7) with socket head screw (13), capscrew (14), two
washers (8), and locknuts (9). Tighten locknuts (9) to 31 lb-ft (42 N
.
m).
19.
Install panel (19) to cargo shell (7) with four rivets (20) and to wheelhouse (11) with three
rivets (20).
SMI 9-2320-387-14&P-1
25-20.8
Change 4


Back to Top