25-7.1. CARGO SHELL MAINTENANCE (M1151) (
Cont’d
)
FOLLOW-ON TASKS: • Install dovetail spring (para. 11-28).
• Install antenna (para. 12-24), if present.
• Install front and rear strikers (para. 11-25 and para. 11-26).
• Install cargo shell door (para. 11-14).
SMI 9-2320-387-14&P-1
Change 4
25-21