25-7.1. CARGO SHELL MAINTENANCE (M1151)
This task covers:
a. Removal
b.
Installation
INITIAL SETUP:
Applicable Models
M1151
Tools
General mechanic's tool kit:
automotive (Appendix B, Item 1)
Materials/Parts
Eight locknuts (Appendix G, Item 106)
Nine locknuts (Appendix G, Item 109)
Four locknuts (Appendix G, Item 87)
Seven blind rivets (Appendix G, Item 271.4)
Assembled locknut (Appendix G, Item 194)
Grease (Appendix C, Item 34)
Adhesive tape (Appendix C, Item 80)
Personnel Required
One mechanic
One assistant
Manual References
TM 9-2320-387-24P
Equipment Condition
•Cargo shell door removed (para. 11-14).
•Front and rear strikers removed
(para. 11-25 and para. 11-26).
•Antenna removed (para. 12-24),
if present.
•Dovetail spring removed (para. 11-28).
Maintenance Level
Direct support
NOTE
• The procedures for removing and installing the right cargo shell
and left cargo shell are basically the same. This procedure covers
the right cargo shell.
• For instructions on replacement of rivets, refer to para. 33-7.
1.
Remove seven rivets (19) and panel (18) from cargo shell (8) and wheelhouse (11).
2.
Remove two locknuts (9), washers (10), and screws (13) from cargo shell (8) and striker mounting
plate (12). Discard locknuts (9).
3.
Remove nine locknuts (14), washers (7), capscrews (6), washers (7), and spacers (17) from cargo
shell (8) and wheelhouse (11). Discard locknuts (14).
4.
Remove two locknuts (15), washers (16), capscrews (20), and washers (16) from cargo shell support
tube (2) and wheelhouse (11). Discard locknuts (15).
5.
Remove two locknuts (5), washers (4), capscrews (3), and washers (4) from cargo shell support
tube (2) and C-pillar (1). Discard locknuts (5).
6.
Remove capscrew (28), washer (27), snubber (26), mount (25), bushing (24), and plate (22) from rear
ring support (23) and C-pillar support bracket (21).
a. Removal
SMI 9-2320-387-14&P-1
25-20.2
Change 4