TB-9-2320-279-13-P-2

TECHNICAL BULLETIN; CREW PROTECTION KIT

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS (RPSTL)

SEPTEMBER 2005

  TB-9-2320-279-13-P-2 - Page 160 of 460

TB 9-2320-279-13&P-2
CENTER BLAST DEFLECTOR REPLACEMENT - CONTINUED
0029 00
0029 00-4
INSTALLATION - CONTINUED
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may cause injury or death to per-
sonnel.
NOTE
Center blast deflector weighs 147 lb (67 kg).
Position center blast deflector with left edge above left side blast deflector and with right edge below
right side blast deflector.
3.
Attach and secure lifting device under center blast deflector (7).
4.
Using lifting device, install center blast deflector (7) on vehicle.
5.
Install six washers (2) and new locknuts (1) on center blast deflector (7). Tighten locknuts to 280 lb-ft (380 Nm).
6.
Install four washers (6), bolts (5), washers (4), and new locknuts (3) on right side of center blast deflector (7). Tighten
locknuts to 280 lb-ft (380 Nm).
7.
Connect drag link (8) to pitman arm.
8.
Install screw (9), new lockwasher (10), and nut (11) on pitman arm
9.
Install left blast deflector (WP 0028 00).
END OF WORK PACKAGE


Back to Top