TB-9-2320-279-13-P-2

TECHNICAL BULLETIN; CREW PROTECTION KIT

OPERATOR’S, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LISTS (RPSTL)

SEPTEMBER 2005

  TB-9-2320-279-13-P-2 - Page 177 of 460

TB 9-2320-279-13&P-2
SIDE ARMOR REPLACEMENT - MODEL B - CONTINUED
0031 01
0031 01-7
Change 1
INSTALLATION - CONTINUED
3.
Attach sling and lifting device to two lifting eyes (22) on side armor (37).
NOTE
Position top of side armor just below roof edge.
4.
Using lifting device, install side armor (37), two washers (28), bolts (29), attachment plates (27), washers (26), and new
locknuts (25) on side of vehicle.
5.
Install 10 washers (33), bolts (34), washers (19), and new locknuts (18) on side of vehicle.
6.
Install nine washers (36) and bolts (35) on front edge and bottom edge of side armor (37).
7.
Install three armor washers (32), washers (31), bolts (30), washers (23), and new locknuts (24) on side armor (37).
440-057
17
18
19
20
21
22
23
24
25
26
27
22
28
29
33
34
35
36
37
28
29
32
31
30
30
31
32


Back to Top