TB-9-2320-302-13-P-2

CREW PROTECTION KIT PART 2 OF 3

TECHNICAL BULLETIN; OPERATOR'S, UNIT AND DIRECT SUPPORT, MAINTENANCE MANUAL, INSTALLATION INSTRUCTIONS AND REPAIR PARTS AND SPECIAL TOOLS LIST

JUNE 2007

  TB-9-2320-302-13-P-2 - Page 316 of 396

TSB 0012 - LATCH PIN RETENTION
6 Feb 2006
REQUIRED TOOLS:
1/8” Drill Bit and Drill
1/8” x 3/4” Roll Pin
Hammer
Welder (Option 2 Only)
PROCEDURE:
OPTION 1:
1.) Drill a 1/8” hole through the latch
and pin, 3/4” deep, as shown.
2.) Install the Roll Pin to ensure permanent
retention of the Latch Pin.
3.) Repeat for 2nd Pin.
OPTION 2:
1.) Fillet Weld around the base of both pins.
This bulletin modifies the door Cam Latches to ensure permanent retention of
the linkage pins.
0039 00-22


Back to Top