5-59
TB 9-2320-387-35-4
Section XXII. PLGR POWER CABLE INSTALLATION
22-1.
Route PLGR power cable (2) from PLGR assembly (1) to B-beam (3).
22-2.
Attach shrink tubing (7) and terminal lugs (5) and (11) to PLGR power cable negative lead (10) and
PLGR power cable positive lead (8). (Refer to TM 9-2320-387-24 for terminal connector repair.)
22-3.
Attach PLGR power cable positive lead (8) to 24-volt terminal board stud (4) with existing nut (6).
22-4.
Attach PLGR power cable negative lead (10) to ground strap stud (12) with existing nut (9).
Figure 5-75.
5. TERMINAL LUG – 7728780 – QTY. 1
7. SHRINK TUBING – MS23053/4-302-0 – QTY. A/R
11. TERMINAL LUG – 7728777 – QTY. 1
Figure 5-74.
2. PLGR POWER CABLE – 9728558-10 – QTY. 1
2
1
2
3
8
9
6
5
7
10
11
7
12
4
~