TB-9-2350-277-40-P-1

CARRIER, MORTAR, 120-MM M121, SELF-PROPELLED M1064A3

TECHNICAL BULLETIN; INSTALLATION OF CREW II MODIFICATION KIT PART 1 OF 4

JUNE 2009

  TB-9-2350-277-40-P-1 - Page 18 of 100

TB 9-2350-277-40&P-1
INTRODUCTION – Continued
0001 00
0001 00-4
b.
Ensure all kit parts are available prior to installation.
See WP 0014 00 for a list of kit parts.
Inspect all kit parts for signs of cracking or distortion of the supports and brackets, damaged
cables, and missing hardware.
c.
After kit installation, ensure all kit components are mounted securely.
Inspect new cables to
ensure they are securely clamped and tied to the existing cables and will not be pinched or
damaged during carrier operation.
14. Tools and Equipment.
a.
Commonly used tools and equipment having application to sustainment maintenance, in
general, furnished by the maintenance activity/contractor.
See WP 0011 00.
b.
Special tools.
See WP 0011 00.
c.
Fabricated tools.
See WP 0012 00.
15. Recording and reporting of the installation.
a.
Reporting requirements.
Refer to AR 750-10/DA Pamphlet 750-8.
b.
Marking equipment.
No marking of equipment or vehicle is required.
16. Material change (MC) number.
Not applicable.
END OF WORK PACKAGE


Back to Top