TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 91 of 704

0008-13
Change 1
TB 9-3950-253-13&P
0008
SECURE CONTAINER FOR TRANSPORT – CONTINUED
Secure Twistlocks
0008
WARNING
DO NOT move vehicle until container is secured.
During these adjustments, personnel are required to work outside the vehicle where there
are several projecting parts, and personnel are required to bend down. Take care when
bending and straightening. A hard hat is required.
Failure to follow these warnings may result in injury to personnel.
NOTE
Perform steps 2 through 6 for both right and left sides.
2. At rear of vehicle, remove locking pin (Figure 16, Item 6) and rotate twistlock assembly (Figure 16, Item 3) up
into twistlock housing (Figure 16, Item 1). Install locking pin.
3. Pull down handwheel locking pin (Figure 16, Item 4) and rotate to position that allows movement of handwheel
(Figure 16, Item 5).
4.
Loosen handwheel (Figure 16, Item 5) to extend anvil (Figure 16, Item 7) into container corner casting
(Figure 16, Item 2). Rotate anvil 90° to position perpendicular with opening in corner casting.
5. While maintaining anvil (Figure 16, Item 7) position, securely tighten handwheel (Figure 16, Item 5).
6. Pull down and rotate handwheel locking pin (Figure 16, Item 4) into position between handwheel fingers.
Figure 16.
Secure Twistlock Assembly.
08
1
2
3
4
5
6
5
3
7
1


Back to Top