TM-5-2330-378-14-P

SEMITRAILER, LOWBED: 40 TON CONSTRUCTION EQUIPMENT TRANSPORTER M870 AND M870A1

TECHNICAL MANUAL; OPERATOR'S, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

JUNE 1999

  TM-5-2330-378-14-P - Page 246 of 524

TM 5-2330-378-14&P
4-74. LOCKPIN REPLACEMENT.
This Task Covers:
a.
Removal
b.
Installation
Initial Setup:
Tools/Test Equipment:
- Semitrailer coupled to towing vehicle (pare 2-8).
- Common no.1 tool set (item 6, Appendix B)
Personnel
Required:
Two
Equipment
Conditions:
- Semitrailer unloaded (para 2-10).
NOTE
There are two locking pins. This procedure
is the same for both the left-side and the
right-side
locking pin.
a.
REMOVAL
1.
Using bolt cutter, cut chain (1) at link closest to lockpin (2).
7
on
7
0
1
0
0
3
6
2
2
1
5
4-158


Back to Top