5-28. CLIP REPLACEMENT(M870).
ThisTaskCovers:
a.
Removal
b.
Installation
Initial Setup:
Toolsfrest
Equipment:
References:
TC 9-237
• Field maintenance tool set (Item 4, Appendix B)
• Tool kit, general mechanic's:
automotive
(Item 7, Appendix B)
a.
REMOVAL
NOTE
The number of clips on the semitrailer varies. This procedure is forthe replacement
of one clip.
Repeat as necessary for other clips. Clips are located along the frame
of the semitrailer
deck, under the planks.
1
Remove screw (1) and nut (2) from plank (3) and clip (4).
2.
Using torch, cut clip (4) from frame (5). Grind off weldment.
b. INSTALLATION
1.
Secure clip (4) to frame (5) and plank (3) using nut (2) and screw (1).
2.
Weld clip (4) to frame (5) (refer to TC 9-237).
1
3
2
FOLLOW-ON
TASKS:
*None
5-64


Back to Top