CREW COOLING SYSTEM CHARGING & PURGING PROCEDURES -
CONTINUED
1. Fill bottle (7) with solution from Section a, step 1.
Figure 2-23.
Charge/Purge Kit for Charging MCG.
2. Connect black tube (2) on latch tether (1) to black connector (4) on lid (6) of filled bottle (7).
3. Connect clear tube (11) on latch tether (1) to white connector (10) on lid (9) of empty bottle (8).
4. Connect pump (3) to white connector (5) on lid (6) of filled bottle (7).
Figure 2-24.
Charging MCG.
TM 5-2350-262-10
2-86.6
Change 7