CREW COOLING SYSTEM CHARGING & PURGING PROCEDURES -
CONTINUED
6. Operate hand pump (5) to purge MCU (1).
Figure 2-33.
Purging MCU and Hand Pump.
7. Disconnect umbilical for MCU (1) from release tether (2).
Turn the MCU on by turning the knob on the BCA clockwise (Figure 2-23) while observing
the charge kit bottle.
The BCA has incremental positions from “OFF” to 1-9 and
“FULL”.
Higher numbers provide greater cooling power.
Figure 2-23.
Bypass and Control Assembly (BCA)
TM 5-2350-262-10
2-86.12
Change 7