TM-5-2350-262-10

ARMORED COMBAT EARTHMOVER (ACE), M9

OPERATOR'S MANUAL

  TM-5-2350-262-10 - Page 146 of 302

CREW COOLING SYSTEM CHARGING & PURGING PROCEDURES -
CONTINUED
NOTE
Solution will begin to flow into EMPTY bottle, indicating that MCG is flooded.
1. Operate hand pump (5) to fill MCG (1).
2. Disconnect MCG (1) from latch tether (2).
3. Release pressure from bottles (4 and 6) by untightening lids (3 and 7).
4. Transfer any solution from EMPTY bottle (6) back into FILLED bottle (4).
C.
Purging MCG:
1. Connect black tube (2) on latch tether (1) to black connector (2) on lid (6) of EMPTY bottle (7).
Figure 2-25.
Charge/Purge Kit for Purging MCG.
3. Connect pump (3) to white connector (5) on lid (6) of EMPTY bottle (7).
TM 5-2350-262-10
Change 7
2-86.7


Back to Top