TM-5-2350-262-10

ARMORED COMBAT EARTHMOVER (ACE), M9

OPERATOR'S MANUAL

  TM-5-2350-262-10 - Page 147 of 302

CREW COOLING SYSTEM CHARGING & PURGING PROCEDURES -
CONTINUED
1. Connect latch tether (2) to umbilical for MCG (1).
Figure 2-26.
Latch Tether for Purging MCG.
Figure 2-27.
Purging MCG.
2.
Loosen cap (6) on FILLED bottle (5) to allow for purging.
3. Operate hand pump (4) to purge MCG (1).
4.
Disconnect MCG (1) from latch tether (2)
NOTE
Solution will flow out into FILLED bottle.
When flow stops, purging is complete.
TM 5-2350-262-10
2-86.8
Change 7


Back to Top