INSTALLATION - Continued
3.
Connect blade folder harness lead #514 (Figure 7, Item 4) to control box power harness lead
(Figure 7, Item 1).
4.
Connect control harness lead #450 (Figure 7, Item 3) to control box power harness lead (Figure 7, Item 2).
M0099HBF
1
4
3
2
Figure 7.
Control Box Power Wiring Harness Installation.
5.
Install control box power harness ground terminal (Figure 8, Item 5) with bilge pump light ground
(Figure 8, Item 1) with screw (Figure 8, Item 2).
6.
Install ejector panel (Figure 8, Item 4) to hull with four screws (Figure 8, Item 3) retained from Step (2).
5
M0100HBF
4
1
3
2
Figure 8.
Control Box Power Wiring Harness Installation.
END OF TASK
TM 5-2350-377-13&P
0025
0025-5