TM 5-3895-372-20
POWER TRAIN.
4-10. UNIVERSAL JOINTS MAINTENANCE (Continued).
LOCATION/ITEM
ACTION
REMARKS
A. REMOVAL
NOTE
The illustration shows all bearings (14) and universal joints of the power train. Use it to decide
which bearings you will need to loosen to allow slack in the drive system.
Before removing U-joints, be sure that shafts (5) and yokes (2) are punch marked.
TA 076176
4-21