TM-5-3990-263-13-P

PALLET, ADAPTER, BRIDGE, M15

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL)

APRIL 2012

  TM-5-3990-263-13-P - Page 397 of 728

FIELD MAINTENANCE
FRONT ROLLER ASSEMBLY REPLACEMENT
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanics: Automotive
(WP
0078, Table 2, Item 2)
Materials/Parts
Lockwasher (WP
0082, Table 1, Item 42) Qty:
2
References
Parts Manual (WP
0073, Figure 6)
References (cont.)
WP
0038
WP
0070
Equipment Condition
Load removed from the BAP. (WP
0008)
BAP unloaded from the CBT. (WP
0006)
REMOVAL
1.
Remove two screws (Figure 1, Item 1) and lockwashers (Figure 1, Item 2) securing shaft cap (Figure 1, Item
3) to roller housing (Figure 1, Item 4). Discard lockwashers.
7
1
2
3
5
6
8
4
Figure 1.
Front Roller Assembly Removal.
2.
Using one hand to support front roller (Figure 1, Item 5), slide shaft (Figure 1, Item 6) out of roller housing
(Figure 1, Item 4), thrust washer (Figure 1, Item 7), and roller (Figure 1, Item 5).
3.
Remove front roller (Figure 1, Item 5) and thrust washer (Figure 1, Item 7) from roller housing (Figure 1, Item
4).
TM 5-3990-263-13&P
0046
0046-1


Back to Top