TM-5-3990-263-13-P

PALLET, ADAPTER, BRIDGE, M15

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL)

APRIL 2012

  TM-5-3990-263-13-P - Page 409 of 728

REMOVAL - Continued
2
12
13
14
8
Figure 3.
Transload Roller Pin Removal.
6.
Remove headed pin (Figure 3, Item 14) and roller (Figure 3, Item 8) from transloader bracket (Figure 3, Item
2).
7.
Lubricate straight pin (Figure 3, Item 7) and headed pin (Figure 3, Item 14) in accordance with
(WP
0070).
END OF TASK
INSTALLATION
1.
Install headed pin (Figure 4, Item 14) in bracket (Figure 4, Item 2), roller (Figure 4, Item 8), and transloader
collar (Figure 4, Item 13), ensuring holes in transloader collar (Figure 4, Item 13) and headed pin (Figure 4,
Item 14) align.
TM 5-3990-263-13&P
0049
0049-3


Back to Top