TM 5-4210-249-13&P-3
0328-2
DRAFT
0328
INSTALLATION
1.
Install panel light switch (2) on pump operator’s panel (5) with washer (4) and nut (3).
2.
Install two wires (1) on panel light switch (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Close pump operator’s panel housing (WP 0325)
2.
Connect batteries (TM 9-2320-325-14&P)
END OF TASK
END OF WORK PACKAGE
TFFT00572