TM 5-4210-249-13&P-3
0408-1
DRAFT
0408
FIELD LEVEL MAINTENANCE
POWER DISTRIBUTION BOX CONTROL PANEL (PUMP HOUSE) REPLACEMENT
INITIAL SETUP:
REMOVAL
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
Note position of connectors before removal to ensure proper installation.
1.
Disconnect main wire harness connector (1) from power distribution panel connector (2).
2.
Disconnect pump panel wire harness connector (3) from power distribution panel connector (4).
3.
Remove nut (5), lockwasher (6), and power distribution panel connector (2) from power distribution box (7).
Discard lockwasher.
4.
Remove nut (8), lockwasher (9), and power distribution panel connector (4) from power distribution box (7).
Discard lockwasher.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT02563
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Lockwasher (1)
Lockwasher (1)
References
WP 0615, Fig. 83
Equipment Conditions
Pump house panel S removed (WP 0540)
Preheat breaker removed (WP 0391)
Auto fill control removed (WP 0363)
Terminal block (pass-through)
removed (WP 0429)
Dual governor pressure switch
removed (WP 0386)