TM 5-4210-249-13&P-3
0410-2
DRAFT
0410
INSTALLATION
1.
Install pressure regulator (4) on hose (9).
2.
Install gasket (7) and pressure regulator (4) on valve cover (8) with two washers (6) and screws (5).
Tighten
two screws (5) to 7.5 to 9.5 N•m.
3.
Install hose (2) on pressure regulator (4) and pipe (3) with two clamps (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install pump house panel Q (WP 0540)
2.
Install driver side crew cab access door (WP 0499)
END OF TASK
END OF WORK PACKAGE
TFFT4526