TM 5-4210-249-13&P-3
0409-3/(4 blank)
DRAFT
0409
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4.
Connect T2 connector (9) to ground terminal (10) with washer (8), lockwasher (7), and nut (6).
5.
Connect T1 connector (4) to power terminal (5) with washer (3), lockwasher (2), and nut (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Install cab instrument panel A (WP 0311)
END OF TASK
END OF WORK PACKAGE
TFFT02596