TM 5-4210-249-13&P-3
0412-2
DRAFT
0412
INSTALLATION
NOTE
All pump house distribution box circuit breakers are installed the same way.
Install circuit breaker (2) on panel (3) and close pump house distribution box (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Install pump house panel S (WP 0540)
END OF TASK
END OF WORK PACKAGE
TFFT01320