TM 5-4210-249-13&P-3
0412-1
DRAFT
0412
FIELD LEVEL MAINTENANCE
PUMP HOUSE DISTRIBUTION BOX CIRCUIT BREAKER REPLACEMENT
INITIAL SETUP:
REMOVAL
NOTE
All pump house distribution box circuit breakers are removed the same way.
Open pump house distribution box (1) and remove circuit breaker (2) from panel (3).
END OF TASK
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT01320
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
References
WP 0615, Fig. 83
Equipment Conditions
Pump house panel S removed (WP 0540)