TM 5-4210-249-13&P-3
0408-3/(4 blank)
DRAFT
0408
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
Install connectors as noted prior to removal.
2.
Install power distribution panel connector (4) on power distribution box (7) with lockwasher (9) and nut (8).
3.
Install power distribution panel connector (2) on power distribution box (7) with lockwasher (6) and nut (5).
4.
Connect pump panel wire harness connector (3) to power distribution panel connector (4).
5.
Connect main wire harness connector (1) to power distribution panel connector (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install dual governor pressure switch (WP 0386)
2.
Install terminal block (pass-through) (WP 0429)
3.
Install auto fill control (WP 0363)
4.
Install preheat breaker (WP 0391)
5.
Install pump house panel S (WP 0540)
END OF TASK
END OF WORK PACKAGE