TM 5-5420-202-10
0048
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
29
During
Launcher
Control Valve
Bank
Figure 27.
Launcher Controls.
a. Check for hydraulic f uid leaks in area of
valve bank.
b. Check for proper response of launcher
controls during launch or retrieve operations.
Any Class III f uid
leak is found.
Fails to complete
launch or retrieve
operation.
0048-25
Table 1.
PMCS - Continued.