TM-5-5420-202-20-2

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 2 OF 4

OCTOBER 1985

  TM-5-5420-202-20-2 - Page 523 of 734

TM 5-5420-202-20-2
MANIFOLD HEATER OPERATIONAL CHECK (Sheet 1 of 2)
PERSONNEL:
Two
PRELIMINARY PROCEDURE: Remove powerplant (page 5-2)
OPERATIONAL CHECK:
NOTE
Make this check after any part of manifold heater system is
replaced. It requires two persons to complete.
1.
Prepare engine for powerplant test run (page 5-25).
2.
Station one person on side of engine where maintenance was performed, with his hand
on intake manifold heater tube (A).
Go on to Sheet 2
7-288


Back to Top