TM 5-5420-202-20-3
MASTER CONTROL PANEL REPAIR (Sheet 33 of 73)
Circuit Breaker Replacement (Sheet 1 of 7)
PROCEDURE INDEX
PROCEDURE
Removal Circuit Breakers (A,B,C, and E)
Installation Circuit Breakers (A,B,C, and E)
Removal Circuit Breaker (D)
Installation Circuit Breaker (D)
Removal Circuit Breaker (F)
Installation Circuit Breaker (F)
Removal Circuit Breaker (G)
Installation Circuit Breaker (G)
PAGE
10-71
10-71
10-72
10-73
10-74
10-75
10-76
10-76
TOOLS:
3/8 in. socket with 1/2 in. drive
4 in. flat-tip screwdriver
Ratchet with 1/2 in. drive
Cross-tip screwdriver
11/32 in. wrench
SUPPLIES:
Silicone compound (Item 32, Appendix D)
Lockwashers
PRELIMINARY PROCEDURE: Remove panel from vehicle (page 10-34).
NOTE
There are seven circuit breakers located
in the master control panel.
Five cir-
cuit breakers (gas particulate (A),
IR (night vision), power (B), fuel shut-
off (C), fuel pump (D) and bilge pump
and utility outlet (E)) are replaced by
removing mounting screws from the
front of the panel. Two circuit break-
ers (gage (F) and manifold preheat (G)
are replaced by removing mounting
screws from the rear of the panel.
Go on to Sheet 2
TA249011
10-70