TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 329 of 1060

TM 5-5420-202-20-3
ENGINE WIRING HARNESS REPLACEMENT (Sheet 1 of 12)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
10-286
Installation
10-292
TOOLS:
Spanner wrench
Cross-tip screwdriver
3/8 in. combination box and open end wrench
Flat-tip screwdriver
3/4 in. combination box and open end wrench
Slip joint pliers
7/8 in. combination box and open end wrench
Diagonal cutting pliers
2 in. extension with 1/2 in. drive
Adjustable wrench
Ratchet with 1/2 in. drive
9/16 in. combination box and
7/16 in. socket with 1/2 in. drive
open end wrench
1/2 in. socket with 1/2 in. drive
SUPPLIES:
Lockwashers (33 required)
Silicone compound (Item 32, Appendix D)
Cable ties (as required)
PRELIMINARY PROCEDURE:
Remove powerplant (page 5-2)
10-286


Back to Top