TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 458 of 1060

TM 5-5420-202-20-3
DUST DETECTOR HULL INTERMEDIATE LEAD ASSEMBLY REPLACEMENT
(Sheet 2 of 4)
2.
Using slip joint pliers, unthread retaining
nut (C) from shell (D). Slide retaining nut
(C) back along cable.
3.
Slide sleeving (E) back along lead assembly (F).
4.
Slide bushing (G) back along cable.
5.
Remove pin (H) from position “C” of insert (J).
6. Pull lead assembly (F) back through bushing (G)
9.
10.
and retaining nut (C).
Using diagonal cutting pliers, cut tie wraps
securing lead assembly (F) along smoke lead.
Disconect lead assembly connector (P) from
short lead (Q) on dust detector warning light
wiring harness.
11.
Remove hull intermediate lead assembly
(F) from vehicle.
Go on to Sheet 3
7.
Using socket, remove four screws (K),
lockwashers (L), and flat washers (M)
securing plate (N) to hull floor.
8.
Remove plate (N) from hull floor.
Change 1
10-298.9


Back to Top