TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 459 of 1060

TM 5-5420-202-20-3
DUST DETECTOR HULL INTERMEDIATE LEAD ASSEMBLY REPLACEMENT
(Sheet 3 of 4)
INSTALLATION:
1.
Connect connector (A) of replacement hull intermediate lead assembly (B) to short lead
(C) of dust detector warning light harness assembly.
2.
Route replacement hull intermediate lead assembly (B) beneath cable retaining straps from
dust detector warning light box (D) to behind instrument panel cluster assembly (E) and
along smoke lead (F) under floor up to starter cable connector (G).
Go on to Sheet 4
Change 1
10-298.10


Back to Top