TM-5-5420-202-20-3

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 3 OF 4

OCTOBER 1985

  TM-5-5420-202-20-3 - Page 608 of 1060

TM 5-5420-202-20-3
LEFT AND RIGHT FINAL DRIVE REPLACEMENT (Sheet 3.1 of 4)
6.
7.
8.
CAUTION
Do not damage threads on
mounting studs when install-
ing studs through mounting
holes.
Carefully guide mounting studs through
mounting holes (D) in side of hull.
Using lubricating oil, lubricate 17 new self-
locking nuts (E)
Using fingers, start threads of 17 new
self-locking nuts (E) onto final drive studs (IV.
9.
10.
11. Remove hoist hook from final drive lifting eye.
12. Using 3/16 inch
13.
14.
15.
Using socket or offset link, install 17 new
self-locking nuts (E).
NOTE
Use hand impact wrench offset
link with torque wrench where
torque wrench cannot be used
due to lack of space.
Using torque wrench, tighten 17 new self-
locking nuts (E) to 460-500 lb-ft (625-680
N·m).
NOTE
If your final drive is to be equipped with final drive
venting system, perform steps 12 through 26 skipping
step 21.
If your final drive is to be equipped with an air pressure
relief valve, skip steps 12 through 20.
allen wrench, remove plug (G) from final
Using adjustable wrench, install elbow (H)
onto right final drive where plug (G) was.
Using fingers, connect tubing (J) to elbow (H).
Using torque wrench and
crowfoot wrench, tighten tubing (J) nut
75-85 lb-in (8.4-9.5 N·m).
Go on to Sheet 4
RIGHT SIDE
Change 4
12-4.1/(12-4.2 blank)


Back to Top