TM 5-5420-202-20-4
SMOKE GRENADE DISCHARGER BRACKET DUMMY RECEPTACLE REPLACEMENT
(Sheet
2
of
2)
INSTALLATION:
1.
2.
3.
4.
Installation procedures are the
same for both the left and right
dummy receptacles.
Put dummy receptacle (A) and new
gasket (B) in position on back of dis-
charger bracket (C).
Using screwdriver, secure receptacle (A)
and gasket (B) to discharger bracket (C)
with four screws (D) and new lockwashers (E).
Connect electrical connector (F) of
discharger harness (G) to receptacle (H)
at back of discharger (J).
Perform smoke grenade launcher
functional check (page 22-30).
End of Task
22-28