TM-5-5420-202-20-4

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 4 OF 4

OCTOBER 1985

  TM-5-5420-202-20-4 - Page 438 of 534

TM 5-5420-202-20-4
GENERAL MAINTENANCE (Sheet 21 of 33)
Spring Pin Installation (Sheet 1 of 1)
TOOLS:
Ball peen hammer
Hand oiler
SUPPLIES:
Lubricating oil (Item 44, Appendix D)
Hard wood block
1.
Using oil, lightly lube pin (A).
2.
Putting spring pin (A) into hole (B),
keep it as straight as possible.
3.
Using hammer, tap pin
with surface (C).
NOTE
(A) until flush
If structure is not sturdy, support
opposite end of hole with wooden
block (D) while tapping pin (A)
into place.
End of Task
C-22


Back to Top