TM-9-1200-215-34-P

AUTOMATIC FIRE CONTROL SYSTEM (AFCS)

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

FEBRUARY 1999

  TM-9-1200-215-34-P - Page 28 of 266

TM 9–1200–215–34&P
1–16
1–22.
FAULT ISOLATE LRU
DESCRIPTION
This task covers:
a.
Setup
b.
Test
INITIAL SETUP
Tools:
Tool Kits, JTK–17LAL, TK–101/G, or TK–105/G
(items 34, 35, & 36, Appendix E)
Electronic Shop, Transportable, AN/TSM–191(V)3
(item 11, Appendix E)
Work Station Kit, Electronic (item 38, Appendix E)
TPS for Paladin LRUs (item 37, Appendix E)
Equipment Condition:
Unenergized LRU is on workbench.
Personnel Required:
One MOS 35Y
NOTE
This is the standard procedure for
fault isolating LRUs before and for
verifying functioning of LRU after
maintenance.
a.
SETUP
CAUTION
ESD SENSITIVE
This procedure involves electrostatic
discharge (ESD) sensitive parts.
Operator must be properly grounded
to static pad set before handling
equipment.
NOTE
The appropriate LRU Assembly
TPS must be loaded into the
Electronic Shop, Transportable
before attempting this procedure.
1.
Attach ESD grounding strap to wrist and
ground to ensure ESD protection.
2.
Locate the Optical Disk Cartridge from TPS for
Paladin LRUs.
Insert cartridge in Electronic
Shop Transportable optical drive.
Select the
LRU test program.
b.
TEST
1.
At system video display, enter steps to begin
test.
2.
Follow instructions shown on video display and
connect LRU assembly to Electronic Shop,
Transportable.


Back to Top