TM-9-1290-365-24-P

PALADIN MUZZLE VELOCITY SYSTEM M93 UPGRADED

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

OCTOBER 2000

  TM-9-1290-365-24-P - Page 249 of 334

ARMY TM 9-1290-365-24&P
D.6.1 3.2 TEST DATA SHEETS. The test data sheets in Table D-12., are to be reproduced locally, as
required, for recording the test results. The test data sheets must be completed each time a test section is
performed. The completed test data sheets shall be retained.
D.6.13.3 PREPARATION FOR TEST.
a. Reassemble the UUT lAW para. D.6.10.3.
b. Energize and adjust DMM1 to measure DC volts.
c. Energize and adjust DMM2 to measure high DC current (l0 Amp).
d. Set switch S1 on the test fixture to PS position.
e. Set ANT S.D switch on the test fixture to OFF position.
f.
Energize and adjust DC power supply to measure +28±1 Vdc. Deenergize DC power supply.
g. Before connecting the UUT to the test setup, verify that the DC power supply is deenergized.
h. Connect the UUT to the test setup lAW Figure D-26.
D.6.13.4 FINAL TESTING. Perform the final testing lAW para.D.6.11.3.
D-79/(D-80 blank)


Back to Top