b. If using diskette, download the appropriate file to the programmer.
c
If using master device, install it on the appropriate socket on the programmer and download its
contents.
d. Obtain a blank, unprogrammed microcircuit lAW appropriate table.
e. Install the blank microcircuit on the programmer, and program the component.
f.
Remove the programmed component from programmer.
g. Mark label with the same microcircuit part number and software version as the master device. Use
label DAT-59-652-1 for U24, U25, U26, and DAT-50-652-1 for U13, or equivalent.
h. Attach label to top of programmed component, covering window completely.
D.7.15 Final Testing.
D.7.15.1 FINAL TESTING PROCEDURES. The final testing is performed on a reassembled UUT. The
test setup provided in Figure D-33 shows the equipment used and cable hookup for the first procedural
step.
D.7.15.2 TEST DATA SHEETS. The test data sheets in Table D-18 are to be reproduced locally, as
required, for recording the test results. The test data sheets must be completed each time a test section is
performed. The completed test data sheets shall be retained.
D.7.15.3 PREPARATION FOR TEST.
a. Energize and adjust DMM to measure DC volts.
b. Set ACCL switch on the test fixture to OFF position.
c. Set switch S1 on the test fixture to DOP.OUT position.
d. Set switch S6 on the test fixture to MVP-11 position.