TM-9-1290-365-24-P

PALADIN MUZZLE VELOCITY SYSTEM M93 UPGRADED

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

OCTOBER 2000

  TM-9-1290-365-24-P - Page 275 of 334

e. Set switch S3 on the test fixture to 4MHZ position.
f.
Set switch S4 on the test fixture to DOPP position.
g. Before connecting the UUT to the test setup, verify that the text fixture is deenergized.
h. Connect the UUT to the test setup lAW Figure D-33.
D.7.15.4 FINAL TESTING.
Perform the final testing lAW para. D.7.12.3 through D.7.12.7.
D105/(D-106 blank)


Back to Top