TM-9-1290-365-24-P

PALADIN MUZZLE VELOCITY SYSTEM M93 UPGRADED

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

OCTOBER 2000

  TM-9-1290-365-24-P - Page 51 of 334

ARMY TM 9-1290-365-24&P
SECTION I. GENERAL INSTRUCTIONS
Section Contents
Subject
Page
General.
................................................................................................................................
3-3
Maintenance Scheduling .
.....................................................................................................
3-3
Materials Required .
..............................................................................................................
3-4
Cleaning .
..............................................................................................................................
3-4
External Inspection.
..............................................................................................................
3-4
Refinish of Painted Surfaces.
...............................................................................................
3-5
Replacement of Identification Plates .
...................................................................................
3-5
Cable Testing .
......................................................................................................................
3-5
Troubleshooting.
...................................................................................................................
3-5
3.1. GENERAL.
This chapter provides maintenance instructions for all M93 MVS components. Refer to
Appendix D for all depot-level maintenance instructions on components that are not listed in
this chapter.
3.1.1 Maintenance Scheduling
. Table 3-1 provides the maintenance schedule for the M93
MVS and refers to the applicable paragraph, which describes the check.
Table 3-1. Maintenance Schedule
Maintenance Level
Maintenance Action
Paragraph
Frequency
Operator
-Cleaning
-External Inspection
-Self-Test
3.1.4
3.1.5
Every use
Every use
Every use
Organizational
a. R&R of Transceiver Assy, Power
and Data Cables, and 1553
Termination.
b. Repair of Mounting Bracket Assy.
3.2, 3.3,
3.4,
3.5, 3.6
3.5
As required
As required
Direct/General Support
a. Repair of Power and Data Cables
b. Repair of 1553 Termination.
3.2 and 3.3
3.4
As required
Depot (Contractor)
-Repair of repairable components
-Transceiver Performance
Appendix D
Appendix D
As required
3-3


Back to Top