TM-9-2320-209-10-1

2 1/2-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; OPERATION, INSTALLATION AND REFERENCE DATA; OPERATOR LEVEL

SEPTEMBER 1980

  TM-9-2320-209-10-1 - Page 420 of 549

TM 9-2320-209-10-1
1.
Rig the winch cable (l) for derrick operation. (Refer to para 4-15f.)
2.
Raise the derrick tube (2). (Refer to para 4-15c.)
3.
Make winch cable (1) fast to pole (3), slightly above balance point (4).
4.
Operate rear winch (5) slowly to lift pole (3). (Refer to para 4-15d.)
5.
Stop the winch when pole (3) is just clear of ground and in position over hole (6).
GO TO FRAME 3
4-366
3? U.S. GOVERNMENT PRINTING OFFICE: 1989 643-025/80123
PIN: 046723-001


Back to Top