TM 9-2320-209-10-1
FRAME 4
Soldier A 1.
Using pole pike, push and hold upper part of pole (1) in position.
Soldier B 2.
Using telegraph hand spoon, shovel 4 or 5 loads of dirt into hole (2)
and tamp with back fill tamp.
3.
Repeat step 2 until hole is filled.
Soldier A 4.
Take pole pike away from pole (1).
Soldier B 5.
Using telegraph hand spoon, pile the left over dirt around pole (1).
Soldier A 6.
Using digging and tamping bar, tamp dirt around pole (1).
7.
Operate rear winch (3) to put slack in winch cable (4). (Refer to
par 4-15d.)
Soldier B 8.
Take winch cable (4) from pole (1).
9.
Pull in and secure outriggers (5). (Refer to para 4- 15i.)
4-368