TM-9-2320-209-20-3-1

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 1 OF 4

MAY 1981

  TM-9-2320-209-20-3-1 - Page 269 of 830

TM 9-2320-209-20-3-1
CHAPTER 5
EXHAUST SYSTEM GROUP MAINTENANCE
Section I. SCOPE
5-1. EQUIPMENT ITEMS COVERED .
This chapter gives equipment maintenance
procedures for exhaust pipes and mufflers for which there are authorized corrective
maintenance tasks at the organizational maintenance level.
5-2. EQUIPMENT ITEMS NOT COVERED.
All equipment items for which corrective
maintenance is authorized at the organizational maintenance level are covered in this
chapter.
Section II.
EXHAUST PIPES AND MUFFLERS
5-3. EXHAUST SYSTEM (HORIZONTAL) REMOVAL AND REPLACEMENT
(TRUCKS WITH ENGINE LD 465).
TOOLS :
9/16-inch wrench (2)
Hammer, medium
1/2-inch chisel
SUPPLIES : Tailpipe extension gasket
Front exhaust pipe gasket
Manifold elbow gasket
PERSONNEL: T
W O
EQUIPMENT CONDITION : Truck parked, engine
a.
Preliminary Procedure. Remove air cleaner.
off and cool, handbrake set.
Refer to para 4-3.
WARNING
Do not work on hot exhaust systems.
Personnel can be badly burned.
5-1


Back to Top