TM 9-2320-209-20-3- 2
15-7. DRAG LINK ASSEMBLY REMOVAL AND REPLACEMENT .
TOOLS :
Plier s
Screwdriver bi t
SUPPLIES :
Non e
PERSONNEL: On e
EQUIPMENT CONDITION :
Truck parked, engine off, handbrake set, rear wheel s
chocked .
a .
Preliminary Procedure .
Jack up front of truck chassis. Put safety jack s
under frame .
Refer to Part 1, para 11-4 .
b .
Removal .
FRAME 1
1 .
Using pliers, take cotter pin (1) out of drag link (2) .
2 .
Using screwdriver bit, unscrew adjusting plug (3) until it is out of drag lin k
(2) .
3 .
Do steps 1 and 2 again on other end of drag link (2) .
GO TO FRAME 2
15-2 2