TM-9-2320-209-20-3-3

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 3 OF 4

MAY 1981

  TM-9-2320-209-20-3-3 - Page 457 of 548

TM 9-2320-209-20-3-3
c.
Replacement.
FRAME 1
Soldier A
Soldier B
Soldier A
1.
Put hoist sling (1) on cab protector upper section (2) as shown
and join hoist equipment to sling.
2.
Guide cab protector upper section (2) with rope (3) as it is lifted
onto truck.
3.
Using hoist equipment, lift cab protector upper section (2) into
place on truck.
4.
Push in four pin assemblies (4). Take off hoist sling.
NOTE
Follow-on Maintenance Action Required:
1.
Put body stakes, bows, and wheel chocks into stowed
positions.
Refer to TM 9-2320-209-10.
2.
Lower derrick to support on cab protector. Refer to
TM 9-2320-209-10.
END OF TASK
18-442


Back to Top