INSTALLATION - Continued
15
16
1
2
3
4
5
6
7
8
9
10
11
12
13
14
M0236DAA
Figure 2.
Horn, Solenoid, and Bracket Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Connect battery ground cables. (WP
0350)
2.
Start engine and allow air pressure to build up to normal operating range. Check for air leaks at horn solenoid.
(TM 9-2320-272-10)
3.
Check horn for proper operation. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-2
0343
0343-5/6 blank