IN-CHASSIS RUN-IN - Continued
18.
Inspect engine for leaks (TM 9-2320-272-10).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install surge tank and bracket. (WP
0279)
2.
Install and fill radiator. (WP
0277)
3.
Install transmission-to-transfer case propeller shaft. (Volume 3, WP
0403)
4.
Install transmission PTO-to-hydraulic pump propeller shaft, if equipped. (Volume 4, WP
0713)
5.
Install upper radiator hose and bracket. (WP
0286)
6.
Install hood assembly. (Volume 4, WP
0565)
7.
Fill steering system to proper oil level. (Volume 5, WP
0820)
8.
Fill engine to proper oil level. (Volume 4, WP
0742)
9.
Fill transmission to proper oil level. (Volume 3, WP
0362)
10.
Close air reservoirs drain valve. (TM 9-2320-272-10)
11.
Connect battery ground cables. (WP
0350)
12.
Adjust modulator cable. (Volume 3, WP
0365)
13.
Adjust accelerator linkage. (WP
0268)
14.
Fill coolant system to proper coolant level. (WP
0287)
CAUTION
Never start a new or repaired engine without performing run-in starting procedures.
15.
Perform engine run-in starting procedures.
16.
Start engine, allow air pressure to build up to normal operating range, and check for leaks. Road test vehicle.
(TM 9-2320-272-10)
17.
Change engine oil after first 500 mi (805 km). (Volume 5, WP
0820)
END OF TASK
END OF WORK PACKAGE