FOLLOW-ON MAINTENANCE
1.
Install ether atomizer. (WP
0265)
2.
Install air compressor air intake tube. (Volume 3, WP
0470)
3.
Install air intake pipe and hose. (WP
0246)
4.
Install crankcase breather tube. (WP
0223)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-2
0234
0234-10